1999 UNTIL NOW CHIEF SUPERVISOR IN THE MAINTENANCE DEPARTEMENT OF EDCC TEAM
1979 TO 1999 TWENTY YEARS OF EXPERIENCE IN SAVANNAH SUGAR FACTORY, SEVEN YEARS WORKING AS CHIEF MAINTENANCE OFFICER
PROJECT WORKED ON
2012 -2013 RESPONSIBLE OF A TEAM for SUPERVISION OF REHABILITATION of three steel bridge (tamarin, riviere des galet and souillac) REPLACE damages structure, bolts, NETS, PAINTING, enlarge the bridge by 1.2M.and Commissioning for (road development autorit, MAURITIUS)
2012 RESPONSIBLE OF A TEAM OF SUPERVISION of local work FOR THE ERECTION and Commissioning bagging plant FOR LAFAGE factory (40 m longer,15 m larger ,6 m h) (lafage port lous, MAURITIUS)
2011 RESPONSIBLE OF A TEAM OF SUPERVISION of local work FOR THE ERECTION and Commissioning bilding FOR LAFAGE factory (40 m longer,15 m larger ,6 m h) (lafage port lous, MAURITIUS)
2010 MAINTENANCE AND PREVENTIVE MAINTENANCE FOR CTBV MAURITUIS ON STEAM TURBINE, GEARBOXES, ALTERNATOR 32 MW, MISSES ALIMENT AND RESET ALIMENT UP TO 0,02MM.
MAINTENANCE AND PREVENTIVE MAINTENANCE VENTILATION, BEARING, AND ChEck MISS ALIMENT AND RESET ALIMENT, ETC.
2009 RESPONSIBLE OF A TEAM OF SUPERVISION WORK FOR THE CONSTRUCTION, ERECTION and Commissioning OF six BELT CONVEYOR FOR OMNICANE RAFFINERIE, (SAVANNAH sugar factory, MAURITIUS) FOR THE MECHANICAL
2009 Commissioning OF twelve BELT CONVEYOR FOR fuel RAFFINERIE (fuel sugar factory, MAURITIUS) FOR THE MECHANICAL SERVICES ECT.SERVICES ect.
2008 draftING WORK AND CONSTRUCTION OF A MOBILE belt CONVEYOR FOR LAFAGE RODRIGUE
2007 -2008 draftING WORK FOR THE CONSTRUCTION OF Ethanol, PETORLE PIPING, PUMP STATION FOR ALCODIS UPPORT AT (PORT LOUIS MAURITIUS)
2007 Maintenance and Preventive Maintenance FOR CTBV AND CTSB AT MAURITUIS on gearboxes, alternator 32 MW, misses aliment and reset aliment up to 0,02mm
2006 - 2007 Responsible of a team of SUPERVISION AND draftsman WORK FOR THE CONSTRUCTION OF A NEW COOLING TOWER AND PIPING FOR AIR, SERVICE ,AIR INSTRUMENTATION ,WATER SERVICE, DEMIN WATER AND CONDENSATE WATER AT CTSAV (SAVANNAH, MAURITIUS) FOR THE MECHANICAL SERVICES:
2005 draftING WORK FOR THE CONSTRUCTION OF belt CONVEYOR FOR NEW POWER PLANT AT CTSAV (SAVANNAH, MAURITIUS) FOR THE MECHANICAL SERVICES
2005 Responsible of a team of SUPERVISION AND draftsman WORK FOR THE CONSTRUCTION OF A NEW COOLING TOWER CTDS (UNION ST AUBAIN, MAURITIUS) FOR THE MECHANICAL SERVICES
2004 Maintenance at Reunion Island at CTBR on gearboxes, alternator 32 MW, misses aliment and reset aliment up to 0,02mm
2003 Alcodis installation of turbine and alternator 1.5 MW, belt conveyor, and design and installation CHIMNEY ducting
2003 Maintenance at Victoria hotel upgrading all distribution water pumps, installation of new chiller, installation of hot water pumps, design and IMPLEMENTATION OF new piping to fit new pumping installation
2002 Maintenance steam turbine and gearboxes at MCFI
2002 Maintenance at Lemuria Hotel Seychelles submersible pump, water treatment repair, and reset aliGNment
2001 - 2006 Maintenance and Preventive Maintenance FOR ESSO AT MAURITUIS airport on Kerosene Pumps
2000 TO 2001 Responsible of a team of draftsman in South Africa with Degremont on St Martin project, screening, grit detritor, aeration tank, final settling tank, blower house Thickener, dewatering building, ventilation ducting, settlement tank and so on
2000 TRAINING ON SEWAGE PROCESS IN SOUTH AFRICA
1999 TO 2000 SUPERVISION OF THE CONSTRUCTION OF A NEW FACTORY (PRINCES TUNA MAURITIUS) FOR THE MECHANICAL SERVICES:
- AIR COMPRESSOR EQUIPMENT AND PIPE LINE
- POTABLE WATER TANK, PUMPING STATIONAND PIPE LINE
- FIRE HYDRANT WATER TANK, PUMPING STATION AND MAIN RING LINE.
- GENERAL ARRANGEMENT DRAWING OF BOILER ROOM AND STEAM PIPE LINE
- AS BUILT DRAWING
1999 UNTIL NOW Maintenance and Preventive maintenance at CTBV on pumps, ventilation, bearing, belt conveyor, steam turbine, alternator 32 MW and ceker miss aliment and reset aliment, gearboxes, chain conveyor, cooling towers, etc.
1998 DRAWING OF A MODIFICATION CLARIFIER FOR SUGAR CANE JUICE.
1997 TO 1998 AS BUILT DRAWINGS OF A WHOLE POWER GENERATION PLANT AT SAVANNAH SUGAR FACTORY.
1987 DRAWING OF A NEW BELT CONVEYOR LINKING BAGASSE CARRIER FROM UNIGRATOR TO FIRST MILLING STATION AT SAVANNAH SUGAR FACTORY.
1980 TO 1999 WORKING OF NEW SETUP OF EACH MILLING STATION OF SAVANNAH SUGAR FACTORY
1980 MILLING.
STUDY AND DRAWING OF A NEW MILLING STATION FOR SAVANNAH SUGAR FACTORY.
LANGUAGES
FRENCH : SPEAKING, READING & WRITING - GOOD
ENGLISH : SPEAKING, READING & WRITING - GOOD
………………
SIGNATURE
CURRICULUM VITAE
NAME: : CLAREL DALAIS
PROFESSION : MECHANICAL - DRAUGHTMAN
YEARS WITH FIRM : FROM 1999 , UNTIL NOW
NATIONALITY : MAURITIAN
ACADEMIC QUALIFICATIONS
1999: 6M BUSINESS AWARENESS PROGRAMME – RASITC
1992: CAD TRAINING WITH DISTINCTION MENTION
1978: SCHOOL CAMBRIDGE LEVEL
WORKING EXPERIENCE
1999 UNTIL NOW CHIEF SUPERVISOR IN THE MAINTENANCE DEPARTEMENT OF EDCC TEAM
1979 TO 1999 TWENTY YEARS OF EXPERIENCE IN SAVANNAH SUGAR FACTORY, SEVEN YEARS WORKING AS CHIEF MAINTENANCE OFFICER
PROJECT WORKED ON
2012 -2013 RESPONSIBLE OF A TEAM for SUPERVISION OF REHABILITATION of three steel bridge (tamarin, riviere des galet and souillac) REPLACE damages structure, bolts, NETS, PAINTING, enlarge the bridge by 1.2M.and Commissioning for (road development autorit, MAURITIUS)
2012 RESPONSIBLE OF A TEAM OF SUPERVISION of local work FOR THE ERECTION and Commissioning bagging plant FOR LAFAGE factory (40 m longer,15 m larger ,6 m h) (lafage port lous, MAURITIUS)
2011 RESPONSIBLE OF A TEAM OF SUPERVISION of local work FOR THE ERECTION and Commissioning bilding FOR LAFAGE factory (40 m longer,15 m larger ,6 m h) (lafage port lous, MAURITIUS)
2010 MAINTENANCE AND PREVENTIVE MAINTENANCE FOR CTBV MAURITUIS ON STEAM TURBINE, GEARBOXES, ALTERNATOR 32 MW, MISSES ALIMENT AND RESET ALIMENT UP TO 0,02MM.
MAINTENANCE AND PREVENTIVE MAINTENANCE VENTILATION, BEARING, AND ChEck MISS ALIMENT AND RESET ALIMENT, ETC.
2009 RESPONSIBLE OF A TEAM OF SUPERVISION WORK FOR THE CONSTRUCTION, ERECTION and Commissioning OF six BELT CONVEYOR FOR OMNICANE RAFFINERIE, (SAVANNAH sugar factory, MAURITIUS) FOR THE MECHANICAL
2009 Commissioning OF twelve BELT CONVEYOR FOR fuel RAFFINERIE (fuel sugar factory, MAURITIUS) FOR THE MECHANICAL SERVICES ECT.SERVICES ect.
2008 draftING WORK AND CONSTRUCTION OF A MOBILE belt CONVEYOR FOR LAFAGE RODRIGUE
2007 -2008 draftING WORK FOR THE CONSTRUCTION OF Ethanol, PETORLE PIPING, PUMP STATION FOR ALCODIS UPPORT AT (PORT LOUIS MAURITIUS)
2007 Maintenance and Preventive Maintenance FOR CTBV AND CTSB AT MAURITUIS on gearboxes, alternator 32 MW, misses aliment and reset aliment up to 0,02mm
2006 - 2007 Responsible of a team of SUPERVISION AND draftsman WORK FOR THE CONSTRUCTION OF A NEW COOLING TOWER AND PIPING FOR AIR, SERVICE ,AIR INSTRUMENTATION ,WATER SERVICE, DEMIN WATER AND CONDENSATE WATER AT CTSAV (SAVANNAH, MAURITIUS) FOR THE MECHANICAL SERVICES:
2005 draftING WORK FOR THE CONSTRUCTION OF belt CONVEYOR FOR NEW POWER PLANT AT CTSAV (SAVANNAH, MAURITIUS) FOR THE MECHANICAL SERVICES
2005 Responsible of a team of SUPERVISION AND draftsman WORK FOR THE CONSTRUCTION OF A NEW COOLING TOWER CTDS (UNION ST AUBAIN, MAURITIUS) FOR THE MECHANICAL SERVICES
2004 Maintenance at Reunion Island at CTBR on gearboxes, alternator 32 MW, misses aliment and reset aliment up to 0,02mm
2003 Alcodis installation of turbine and alternator 1.5 MW, belt conveyor, and design and installation CHIMNEY ducting
2003 Maintenance at Victoria hotel upgrading all distribution water pumps, installation of new chiller, installation of hot water pumps, design and IMPLEMENTATION OF new piping to fit new pumping installation
2002 Maintenance steam turbine and gearboxes at MCFI
2002 Maintenance at Lemuria Hotel Seychelles submersible pump, water treatment repair, and reset aliGNment
2001 - 2006 Maintenance and Preventive Maintenance FOR ESSO AT MAURITUIS airport on Kerosene Pumps
2000 TO 2001 Responsible of a team of draftsman in South Africa with Degremont on St Martin project, screening, grit detritor, aeration tank, final settling tank, blower house Thickener, dewatering building, ventilation ducting, settlement tank and so on
2000 TRAINING ON SEWAGE PROCESS IN SOUTH AFRICA
1999 TO 2000 SUPERVISION OF THE CONSTRUCTION OF A NEW FACTORY (PRINCES TUNA MAURITIUS) FOR THE MECHANICAL SERVICES:
- AIR COMPRESSOR EQUIPMENT AND PIPE LINE
- POTABLE WATER TANK, PUMPING STATIONAND PIPE LINE
- FIRE HYDRANT WATER TANK, PUMPING STATION AND MAIN RING LINE.
- GENERAL ARRANGEMENT DRAWING OF BOILER ROOM AND STEAM PIPE LINE
- AS BUILT DRAWING
1999 UNTIL NOW Maintenance and Preventive maintenance at CTBV on pumps, ventilation, bearing, belt conveyor, steam turbine, alternator 32 MW and ceker miss aliment and reset aliment, gearboxes, chain conveyor, cooling towers, etc.
1998 DRAWING OF A MODIFICATION CLARIFIER FOR SUGAR CANE JUICE.
1997 TO 1998 AS BUILT DRAWINGS OF A WHOLE POWER GENERATION PLANT AT SAVANNAH SUGAR FACTORY.
1987 DRAWING OF A NEW BELT CONVEYOR LINKING BAGASSE CARRIER FROM UNIGRATOR TO FIRST MILLING STATION AT SAVANNAH SUGAR FACTORY.
1980 TO 1999 WORKING OF NEW SETUP OF EACH MILLING STATION OF SAVANNAH SUGAR FACTORY
1980 MILLING.
STUDY AND DRAWING OF A NEW MILLING STATION FOR SAVANNAH SUGAR FACTORY.